Category: New Project

The keel laying ceremony of fishing trawler in Ha Long shipyard

On 31st of August, Ha Long Shipbuilding Company held a keel laying ceremony of FISHING TRAWLER which be built for ShipBuilding Asia LTD (Canada). This is a generation of offshore fishing vessel in Canada’s Northern sea and be equipped with modern technology under the international marine fishing law.
After several months of cooperation, negotiation, planning, on the morning of 31/8/2017, Halong Shipbuilding Company held a keel laying ceremony of Fishing Trawler which be built for ShipBuilding Asia LTD (Canada). This is a generation of offshore fishing vessels in the North Sea of Canada and be equipped with modern technology under the international marine fishing law.

Representatives of Ha Long Shipbuilding Company handed over the building contract of  Fishing Trawler for ShipBuilding Asia LTD.

Ha Long shipyard launched two troop-carrier ships Roro 5612

PANO – The Ha Long One-member Shipbuilding Co.Ltd., under the Vietnam Shipbuilding Industry Corporation, has successfully launched two more troop-carrier ships Roro 5612 numbered 3 and 4 for the Venezuelan Navy.

The ship, designed and equipped by the Dutch Damen Group, was built for the Latin American country under the supervision of the French register BV.

One million dollar speedboat designed by Vietnamese engineers

Indian Coast Guard Ship Sarang visits HCM City Tran Song Hai, general director of Greenline DP, the shipbuilder, said the catamaran is 16.6 meters long and has a capacity of 1,200 CV.

The boat can carry 60 passengers and run at a speed of 55-60 kilometers per hour. The speedboat is expected to be put into use to carry passengers to replace old hydrofoils this November.

Vietnam to build ships for maritime research, survey locally

Accordingly, only member companies of the Hanoi-based Vietnam Shipbuilding Industry Corporation (SBIC), previously known as Vinashin, are allowed to join those tenders to secure the rights to build such ships, the website said on Friday.

Prime Minister Dung has assigned the Ministry of Natural Resources and Environment to actively work with the Ministry of Planning and Investment and the Ministry of Finance to allocate necessary capital for the project.